Infrastructure & Facilities

Stockpile Facilities & Quality Control

PT Pelita Natura Nusantara is supported by dedicated stockpile and modern machinery in Pangkalpinang, Bangka Belitung, engineered to keep Palm Kernel Shell clean, dry, and export-compliant.

Stockpile Facility Overview
Stockpile Yard Overview

Palm Kernel Shell Processing & Storage Yard Pangkalpinang

Strategically located at Jl. Laksamana Malahayati No. 78, Airmawar, Bukit Intan, Pangkalpinang, Bangka Belitung Islands. Combining large-scale storage with rapid port transit.

± 2 Ha
Stockpile Yard Area
± 20.000 MT
Stockpile Capacity
± 1 Km
Distance to Port
20–30 cm
Concrete Base Floor
Cleanliness & Dryness Standards

Concrete Slab & Rain Tarpaulin Shield

To preserve product quality, the stockpile is constructed with a concrete cement base approximately 20–30 cm thick, preventing soil contamination. The company also covers stockpiled material with heavy-duty tarpaulins during rainfall to maintain low moisture levels for optimal boiler combustion.

20–30 cm Concrete Base

Zero ground soil contamination during loader handling.

Rain Tarpaulin Coverage

Shields material from rain to optimize calorific value.

Stockpile Quality Protection
Continuous Quality Control

Clean PKS segregated ready for vessel dispatch

6 Key Stockpile Facilities

Machinery and mechanical equipment supporting PKS processing and logistics.

Weighbridge Facility
50 MT Capacity

Weighbridge Facility

Verified Company Specification
1 Unit / Bucket ± 3 m³

Operates 1 unit wheel loader with approximately 3 m³ bucket capacity supporting efficient PKS handling and stockpile maneuvering.

Verified Company Specification
100 MT / Jam (With Brush Cleaning)

High-output screening machine with cleaning brush on the mesh to reduce dirt accumulation and maintain screening accuracy and consistency.

Verified Company Specification
Penyaring Pasir, Abu & Tanah

Mesh size of approximately 3.2 mm dedicated to removing smaller impurities including sand, ash, and soil.

Verified Company Specification
Pemisah Serabut (EFB) & Batu

Separates larger unwanted materials such as empty fruit bunch fiber, stones, large debris, and oversized objects 40 mm and above.

Verified Company Specification
Stage 4 (Screening) & Stage 7 (Handling)

Equipped with 2-stage magnetic separation: Stage 4 during screening and Stage 7 in material handling to extract metallic debris, nails, and steel.

Verified Company Specification

3 Main Stockpile Operational Stages

01

Stage 1: Before Screening

Incoming raw Palm Kernel Shell enters the reception yard before undergoing mechanical screening.

02

Stage 2: Screening Processing

PKS passes through the 100 MT/hour screening line, utilizing Stage 1 magnetic separation, 3.2 mm fine mesh, 40 mm+ oversize mesh, and Stage 2 magnetic separation in material handling.

03

Stage 3: Clean PKS Storage & Dispatch

Screened PKS is held on 20–30 cm concrete floors, covered with rain tarpaulin, and dispatched to the loading port.

Official Quality Control Workflow

Quality Handling Process Diagram

Standard Operational Protocol
Step 1#1

Raw PKS Inflow

Incoming raw PKS from palm oil mills arrives at reception yard.

Next Stage Processing
Step 2#2

Weighing & Yard Handling

50 MT weighbridge recording and wheel loader positioning.

Next Stage Processing
High Capacity#3

100 MT/Hr Screening Feed

High-throughput vibratory screening with automatic brush cleaning.

Next Stage Processing
Metal Removal#4

Magnetic Separation (Stage 1)

Initial extraction of metal and iron particles as material enters the screening line.

Next Stage Processing
Fine Impurities#5

3.2 MM Fine Mesh Screening

Separating ash, loose sand, and fine soil particles under 3.2 mm to keep ash content minimal.

Next Stage Processing
Oversized 40 MM+#6

40 MM+ Oversize Mesh Separation

Filtering out empty fruit bunch (EFB) fibers, stones, and oversized foreign materials 40 mm and above.

Next Stage Processing
Handling Stage#7

Magnetic Separation in Handling (Stage 2)

Secondary magnetic separation in material handling line ensuring zero metallic residues.

Next Stage Processing
Export Ready#8

Clean Storage & Port Loading

20–30 cm concrete base, rain tarpaulin cover, ready for vessel dispatch.

Ready for Shipment